What we thinkยทDelivery method
Delivery method
A long programme is a series of short ones.
Six weeks to a release, two to measure and plan the next. Each cycle is planned on its own, from what the last one taught.
Eighteen months is nine cycles.
Nine releases into production, and nine chances to change course.
A plan for eighteen months is out of date in three.Short cycles that land, one after another, add up.
The business moves, the models move, and what was learned in month two rarely reaches month twelve. So we keep the whole programme in view and plan only the next six weeks in detail.
Every cycle ends with working software in production, not a report or a demo.
The next cycle's scope is chosen at the end of this one, by you, from what it changed.
A new priority, a better model or a lesson from production goes into the next cycle, not into a change request.
You can stop after any cycle and keep everything built so far: the code and the record.
One cycle
Eight weeks: six to a release, two to measure and plan the next.
- Weeks 1โ2
Discover and design
What this cycle must do, written as requirements with numbered criteria and signed by a named person before anything is built.
- Weeks 3โ5
Build and prove
Tests first, then the code. A separate check proves each requirement against its criteria, never the agent that built it.
- Week 6
Release
Into production, accepted by a person you name.
- Weeks 7โ8
Measure and plan
What it changed, against what was asked. Then the next cycle's scope, chosen by you.
Every cycle keeps the same record: who asked for what, what was built, the proof, and who accepted it. Then the next cycle begins, or you stop.
Before and after
The cycles sit between a start that is on us and the care that keeps the work current.
Three days to two weeks, on us, with something working at the end. It tells us both what the first cycle should be.
See First Light The cyclesAgents, Modernize, AdoptWhichever fits, the work runs in the same cycles, on the same record, with the same rules.
See all capabilities After the last cycleEvergreenWhat was built is run, watched and kept current as your business and the models change.
See EvergreenAn eighteen-month transformation becomes nine cycles.Each one lands before the next is planned.
What clients value most is the size of the step. The programme arrives in pieces they can use, and they steer it as it goes, with room to adapt and change along the way.
Read on
The other views behind the way we work.
Twelve views we hold about putting AI to work.
Read our view What we thinkAgent rulesA named person owns it. It can be stopped. No agent certifies its own work.
Read the rules Articles and the podcastThe Next PromptWhere we write and talk about these views as they change.
Open The Next PromptPlan the first cycle with us.
Just a conversation about what you're building. No forms that ask for your budget range. No sales screening process.